Last updated:
You placed the order, closed the tab, and then noticed it: a missing letter in the group name, an XL that should have been a 2XL, a delivery address you moved out of last spring. This page explains how to cancel a Dice Tee order or change it, how long you have, what you get back and what your options are once that time has run out. The short version is that you have 24 hours, and one email does it.
Cancelling and changing at a glance
- Time limit: within 24 hours of placing the order.
- How: email support@dicetee.shop with your order number.
- Cost of a change: nothing.
- Refund for a cancelled order: refund within 7 days.
- After 24 hours: the order is made as placed. Once it is delivered you can return it within 60 days.
- Our reply: within 24 hours on business days.
Why the limit is 24 hours
Everything we sell is printed to order, and making an order takes 1–3 business days. That is quick, and it is the reason the window for changes is short. A tee that says “Kitchen Table Irregulars — The Snack Bringer” cannot be un-printed and it cannot be sold to anyone else, so we need to hear from you before printing begins.
Twenty-four hours is counted from the moment the order is placed, which is the time on your order confirmation email. It is long enough to sleep on the order, send a screenshot of the cart to the group chat and hear back from the one person who always replies late.
There is also no approval step to rescue you later. Nothing is emailed to you for sign-off before printing. We print exactly what was typed, so the 24 hours after ordering are your one chance to edit it.
How to cancel an order
- Find your order number. It is in the subject line and the body of your order confirmation email.
- Email support@dicetee.shop within 24 hours of placing the order. Write from the email address you used at checkout if you can.
- Put “Cancel” and the order number in the subject line so that it is seen quickly.
- Say whether you are cancelling the whole order or only some of the items in it, and name the items.
- Wait for our confirmation. We reply within 24 hours on business days.
The time that counts is the time your email is sent, not the time we answer it. If you write at hour twenty-three on a Saturday night, you are inside the window even though our reply comes on a business day.
What you get back
For an order cancelled inside the window, you receive a refund within 7 days. It goes to the payment method used for the order, and it covers everything you paid for the cancelled items. Shipping was free in the first place, and there is no cancellation fee. If you cancel one item out of several, you are refunded for that item and the rest of the order goes ahead. The Refund Policy explains where refunds go and how store credit works.
How to change an order
A change follows the same route as a cancellation: one email, inside 24 hours, with the order number. The difference is that we need the new details spelled out exactly, because we will print or ship what your email says.
| What you want to change | What to write in your email | Worth knowing |
|---|---|---|
| A size | Which item, the size ordered and the size you want | Adult sizes are S to 5XL; the youth tee is Youth XS to Youth XL |
| The group name | The full name exactly as it should be printed | Spelling, capitals and punctuation are printed as you write them |
| A seat | Which item, the seat ordered and the seat you want | Name the item by size too if several lines look alike |
| The game night or founding year | The new wording, for example “Thursdays” or “Est. 2019” | Say so clearly if you want one of them removed |
| The delivery address | The complete new address, including the postal code and country | We deliver to the United States, Canada, Australia and New Zealand only |
| Removing an item | Which item to take out | That item is refunded within 7 days |
A change of this kind is free. We reply to confirm what was changed, and the confirmation is worth reading as carefully as you read the cart, because it is now the record of what will be printed.
Adding to an order
If you want to add something, a seventh tee or a mug you forgot, the quickest way is to place a second order. Shipping is free with no minimum, so a second order costs you nothing extra. Copy the group name from the first order so that the two match.
Swapping one product for another
Changing a hoodie into a crewneck sweatshirt, or a poster into the canvas, is a different product with its own options and usually its own price. Inside the window, the clean way is to ask us to remove the first item, which is refunded within 7 days, and to order the second one yourself from the shop, where the print check shows you how it will look.
The typo, two ways
This is the situation we hear about most, so here it is played out twice.
Spotted after an hour
The host of Thursday Night Table orders six seat tees and, an hour later, sees “Thurday Night Table” on the confirmation email. One letter, six shirts. The host replies to us straight away with the order number and one line: the group name should read “Thursday Night Table” on all six items. We correct the order, confirm by email, and the shirts are printed with the right name. It costs nothing and there is no delay.
Spotted after two days
Same order, same typo, but nobody looks at the confirmation until two days later. The 24 hours have passed and the tees are being made as typed. We cannot change them now. The shirts will arrive saying “Thurday”, and from the day they are delivered the host has 60 days to send them back with a free return label for a refund or for corrected shirts. It works, but the corrected tees arrive weeks later than they could have. The lesson is not complicated: read the confirmation email the same evening.
After 24 hours: the returns route
Once the window has closed, the order is made and shipped as placed. You are not stuck with it. Returns are open for 60 days from delivery on any item, personalised items included, the return label for a change of mind is free, and there is no restocking fee. The refund follows within 7 days of receiving the return.
- Let the parcel arrive.
- Email us with the order number and tell us what you would like: a refund, store credit or a different size.
- Use the free return label we send you.
The full process is in the Returns & Exchanges Policy. It takes longer than a cancellation, because the parcel has to travel to you and back, which is why the first day matters so much.
If the thing you got wrong is the delivery address and the 24 hours are up, email us anyway with the order number and the correct address. Contact us and we will help.
A five-minute check before the window closes
You would not start a long game without counting the pieces. Give the confirmation email the same treatment.
- Group name. Read it letter by letter, then read it aloud. “Regulars” and “Regualrs” look the same at midnight.
- Seats. One line per person. Check that nobody is missing and nobody is The Host twice.
- Sizes. Match each seat to its size. If you guessed, ask now; the Size Guide has the measurements.
- Game night and year. “Thursdays” and “Est. 2019” are optional. Check that they appear only where you wanted them.
- Address. Unit number, postal code, country.
- Email. If the confirmation reached you, the address works. If someone else needs the tracking details, forward it to them.
Orders placed for someone else
A gift order is cancelled or changed by the person who placed it. If a friend ordered a “Reigning Champion” mug for a player who is moving away and then learns the moving date has shifted, the friend emails us inside the 24 hours with the new address. The recipient does not need to be involved and will not hear from us.
If you are the organiser and several people have asked for last-minute changes, collect them into one email. Six separate messages about one order, each from a different address, are harder to match up than one message from the person who placed it.
Questions about timing
I emailed inside the window but have not heard back yet. Am I covered?
Yes. We go by the time your email was sent. We reply within 24 hours on business days.
Can I cancel by replying to the confirmation email?
The dependable route is a message to support@dicetee.shop with the order number in the subject line.
I placed two identical orders by accident. What now?
Email us within 24 hours with both order numbers and say which one to cancel. The cancelled one is refunded within 7 days.
Can I change an order after it has shipped?
No. A shipped order is handled as a return once it has been delivered. Delivery estimates are on the Shipping & Delivery page.
A two-minute check before you place the order
Most change requests we receive are about things that could have been caught in the cart. Because every personalised piece is printed exactly as typed, and no proof is emailed before production, the cart is your last look at the order before it goes to print. Run through this list once, out loud if it helps, the way the rules reader runs through setup.
- Group name: is it spelled the same way on every line? “The Back Room Regulars” and “Back Room Regulars” will print as two different names.
- Capitals and punctuation: we print them as typed, including an apostrophe or a missing one.
- Seats: does each player have the seat they asked for, and has nobody been given The Host twice by accident?
- Sizes: does each line show the size that person sent you, and is the youth tee in a youth size?
- Colours: if the group agreed on one colour, is every line in that colour?
- Optional lines: the game night and founding year print only if you typed them; leave them empty if you do not want them.
- Address and email: is the shipping address complete, and is the email one you read? The confirmation and any reply from us go there.
If you spot a mistake after paying, you still have 24 hours to ask for the change. Write to us straight away rather than waiting for the confirmation email to arrive.
Contact us about an order you have placed
Email support@dicetee.shop with the order number, and do it as soon as you notice the problem. We answer by email only and reply within 24 hours on business days. Our postal address is Dice Tee, 4322 Norman Dr SE, Grand Rapids, MI 49508, US, but a letter will not reach us inside the window, so please use email for anything urgent.